PROJECT NAME
Restoration and extension of the waste water treatment plant – agglomeration of Intorsura Buzaului – turn-key project
EXECUTED WORKS
- Complete electrical designing – medium and low-voltage
- medium voltage(20kV) electrical installation (transformer cabinet)
- electrical cabinets assembling – for energy distribution, control, local cabinets, lighting
- SCADA system
- Interior/exterior lighting installation
- Grounding installation

DSC_0315

tr

Convertizoare

bty
bty

DSC_8839

tablou electric
dav

RETEA automatizare

camera dispecer