Scroll to top
en ro
Back

Klärwerk Reutlingen – West Assembly and installation of the electrical distribution cabinets and automation

Scroll
CUSTOMER

Hauptklärwerk Reutlingen – West, Germany, sewage treatment plant

PROJECT SCOPE

Assembly and installation of the electrical distribution cabinets and automation

FIELD OF ACTIVITY

Water industry

PROJECT VALUE

≈ 137.000 €

EXECUTED WORKS

Assembly and installation of electrical distribution and control cabinets

TS type Rittal Cabinets with over 25 sections (length >20m), Wohner compact bar system of 1600A TN-S system, the majority of the power connections being realized with flexible copper bars.