PROJECT SCOPE
electrical installation works
FIELD OF ACTIVITY
Food industry
ELECTRICAL DESIGN BY
Electromatic-Systems
EXECUTED WORKS - at the beer factory in MIERCUREA CIUC:
Electricity supply and electricity distribution
Production of distribution and control cabinets 0,4kV
Installation, parameterization and commissioning of a 1600kVA, 20/0.4kV transformer
Design and execution of the electrical installations at the malt silos and boiling section in the field EX – zone 22
Making of cable routes
Installation of cables and instrumentation, emergency buttons
Lighting, EPH system, equipment connection,
PROJECT VALUE
> 100.000 €
EXECUTED WORKS - at the beer factory in CONSTANTA
Making cable routes
Installation of cables and instrumentation, emergency buttons
Lighting, EPH system, equipment connection,
Design and assembling of the electrical installations at the malt silos and boiling section in the field EX – zone 22
PROJECT VALUE
≈ 70.000 €
EXECUTED WORKS - at the beer factory in UNGHENI
Electrical cabling works
Cable route installation, cabling
Pneumatic installations
Instrumentation connection
Commissioning pneumatic system