PROJECT SCOPE
Electrical cabinets for Cargill feed plant
TIME FRAME
2019 – 2020
FIELD OF ACTIVITY
agriculture
PROJECT VALUE
≈ 900.000 €
EXECUTED WORKS
Designing and assembling of electrical cabinets (length 32m!) for the lighting installation and sockets
Bar system of 2500A, installation of protections and contactors through adapters directly on the bar system, direct starters, star-delta starters, soft starters and frequency converters.
400kVA reactive power compensation cabinet with 14% rejection filters
PLC control panel
TIME FRAME
2019
PROJECT SCOPE
Complete electrical installation
EXECUTED WORKS
electrical installation including: over 50.000 m of power and signal cables, installed vertically on galvanized type wire routes,
Hundreds of local switches, different sensors and transducers, including weighing tensometric cells
Interior, safety and panic lighting
Commissioning


CArgill 5